★★★ Quick Ship ★ 1-3 Days ★★★

United Rack

Dallas–Fort Worth

Moving warehouses? One crew handles the racking — both ends.

We design, deliver, and install new & used racking at your new facility — permits included — and we'll buy and tear down the racking you're leaving behind. One point of contact from the old floor to the new one.

The relocation package

Layout & installation

We design the layout for the new space and install it — anchored, plumb, and ready for the first pallet.

New & used racking, delivered

New or quality used rack — uprights, beams, wire decks, shelving — delivered from our DFW yard when the new floor is ready. No mill lead times.

Warehouse design, engineering & permit services

Rack layout drawings, load calculations, and the stamped engineering package your city requires — we handle the permit so the move doesn't stall at the counter.

We buy your old rack

Don't pay to move racking that won't fit the new building — we'll buy it and credit it against your new setup.

Teardown & haul-off

Our crews dismantle and haul everything out of the old facility, on your timeline, so you hand back a clean space.

Warehouse Design & Engineering

Engineered, permitted, and built to code — before the first upright goes up.

Every city in DFW now requires an engineered, permitted rack installation: layout drawings, load calculations, and stamped documentation reviewed and approved before you build. Our in-house engineering team delivers the whole package — design, calculations, and the permit submittal — as one accountable service, in whatever phase you need:

Phase 1 — Walk & Design

We walk your facility, measure the space, and map how product actually moves through it. Applying Six Sigma's Define–Measure–Analyze discipline, we design a rack layout that eliminates wasted travel, dead aisles, and double-handling — capacity you can measure, not guess at. The site walk and quote are free.

Phase 2 — Engineering & Calculations

Our engineers convert the approved layout into a stamped design package: rack load and seismic calculations, anchor and slab specifications, aisle and egress clearances, and fire-code review — the engineering the city requires before it will approve the installation.

Phase 3 — Permit Package

We prepare the complete submittal — site plan, rack elevations, sealed calculations, high-piled storage and fire-department forms, and the building-permit application — file it with your city, answer every plan-review comment, and coordinate the final inspection so your move keeps its date.

Why companies in transition call us

  • One crew and one invoice for the whole move — no juggling a rack buyer, a hauler, and an installer
  • Buyback credit lowers the real cost of racking the new building
  • DFW-based yard and crews — fast scheduling, no freight surprises
  • Used inventory in stock now, so the new building isn't waiting on a mill lead time

Only selling, not moving? Send photos for a fast buyback offer →

Request a quote

Tell us what you need — or what you have to sell — and we'll get back to you the same business day.

Prefer to talk?

Tell us the two addresses and the move date — we'll take it from there.

469-309-3606 raphael@united-rack.com 6509 Stephenson Levy Rd. Fort Worth Texas 76140